United Kingdom · Soft play · Trampoline parks
Soft play equipment for the UK, direct from the factory
Multiplay manufactures commercial soft play equipment, trampoline parks and Ninja Warrior courses in Spain and installs them in the UK with its own crew. We design your soft play frame in 3D at no cost from your floor plan, build it in our factory in San Vicente del Raspeig (Alicante) to EN 1176 and EN 1177, and organise shipping, customs and installation. Since 2009, more than 600 playgrounds in 31 countries.

United Kingdom
What we provide for UK centres
| What you need | What we provide |
|---|---|
| Standards | The European standards used in the UK: BS EN 1176 (playground equipment) and BS EN 1177 (impact-absorbing surfacing) |
| Fire rating | Every material is Euroclass rated (EN 13501-1) |
| Documents | Declaration of conformity, user manual and safety rules, maintenance instructions and inspection schedule, material certificates and a 2-year warranty |
| Shipping and customs | Organised by us with our customs agent and a correspondent at destination; quoted separately |
| Installation | By our own installation crew, who travel to your site |
| Tracking | Private client portal with order status and manufacturing photos |
For soft play centres, family entertainment centres, restaurants, hotels and shopping centres.

Range
What we build
| Product | What it is |
|---|---|
| Soft play frames | Multi-level play frames made to measure, with slides, ball pools and play elements |
| Toddler areas | Soft play for children up to 2, installed in one day |
| Trampoline parks | More than 40 built, with jumping beds to EN 13219 |
| Ninja Warrior courses | Modular obstacle courses for older children and teenagers |
How we work
Your UK project, step by step
Floor plan
You send us the plan of your venue with the clear height.
3D design
We design it at no cost and change it until you approve it.
Quote
The same design in each quality level, with shipping and installation in the UK.
Manufacturing
In our factory in Alicante; manufacturing and installation usually take 4 to 6 weeks.
Installation
A small frame takes 1 to 2 days on site and one of about 40 m² takes 5 to 7 days.
Sources: EN 1176 and EN 1177 are published by CEN, the European Committee for Standardization and, in the UK, by BSI as BS EN.
Frequently asked questions
Do you install soft play in the UK?
Yes. The United Kingdom is one of the 31 countries where we have installed, and our own crew does the installation.
Which standards does your soft play meet?
EN 1176 and EN 1177, including their successive amendments, published in the UK by BSI as BS EN 1176 and BS EN 1177. Trampoline beds follow EN 13219.
Who handles shipping and customs?
We do, with our customs agent and a correspondent at destination. Shipping and installation are quoted separately.
What must the venue have ready?
Finished building work, electricity, water, toilets and climate control, and no other trades working on site.
How do payments work?
A 50 % deposit, 30 % when installation starts and 20 % when it is finished.
Do you sell to distributors?
Yes. Distributors get special discounts and may have exclusivity in their country.
Tell us about your venue
Send us your floor plan and tell us where the venue is.
Related
